Adaptive Engineering AXR Spécifications Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 26
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
- 5 -
Current Version Date: June 2011
5
5. OPERATING INSTRUCTION PICTOGRAMS
TO MOVE LIFT
1. Crank lift onto
wheels.
2. Pull handles down to
release brake.
3. Push lift to aircraft.
4. Extend outriggers.
5. Crank to lower
outriggers.
TO RAISE LIFT
1. Lower ground ramp,
then board lift.
2. Raise and latch
ground ramp.
3. Crank lift up
above sill height.
4. Extend bridge ramp
into doorway.
5. Lower bridge ramp
onto sill of door until
gate opens.
REVERSE STEPS FOR
OFF-LOADING.
NOTE
The decals on the lift may refer to the platform as thedeck”.
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 25 26

Commentaires sur ces manuels

Pas de commentaire